Before manufacturing begins, verify planning conditions, ground levels, utilities, drainage and the access route for delivery and lifting equipment.
Fast factory manufacturing does not remove the need for careful site preparation. Planning compliance, ground conditions, infrastructure and logistics must be considered together before the final design is approved.
Confirm current permissions and local requirements
Land use, development conditions and required documents should be verified with the relevant local authorities and qualified professionals. Requirements vary according to location, building function and project scale.
Ground, levels and drainage
Review bearing conditions, slope, surface-water risk and the final finished level. Coordinating the foundation design with approved production drawings reduces delays and adjustment work during installation.
Access, lifting and utilities
Check road width, tight bends, overhead restrictions, crane positioning, electricity, water and drainage connections. A shared site plan helps all teams understand access routes, responsibilities and safe working zones.